Progress of construction work: Recent photos of the Beta Plant
Construction of the world’s first commercial BTL Plant in Freiberg/ Saxony
- Latest Photos
Intermediate storage Pipelines
steam drum fittings of synthesis
Utility and waste water piperacks
The Beta Plant
Electrical and instrumentation installation
wood drying
Final product storage and tanker
Bund wall for the tank farm
August 2007
Carbo-V gasification
High pressure cycle
gas-compressor of synthesis
Air capacitor
Construction work at piperack
Back to the top
PSA unit for hydrogen production
Synthesis-gas-compressor
Tank farm and utility gases
Heat exchanging device on the roof
of steel structure for Fischer Tropsch synthesis plant
July 2007

The liquid oxygen supply tanks are installed.

Insulation of process equipment in gas production is finished.
Back to the top

The laboratory start to fill up…

Fitting of the cooling units on the roof of the gas production building

Pipelines: construction work

The Beta Plant
Installation of the cooling units