Progress of construction work: Recent photos of the Beta- 炉

Construction of the world’s first commercial Beta- 炉 in Freiberg/ Saxony



  • Latest Photos


Intermediate storage Pipelines


steam drum fittings of synthesis


Utility and waste water piperacks



nach oben


The Beta Plant


Electrical and instrumentation installation


wood drying



nach oben


Final product storage and tanker

Bund wall for the tank farm



August 2007

Carbo-V gasification

Hochdruckkreislaufgasverdichter der Synthese.jpg High pressure cycle
gas-compressor of synthesis

Air capacitor

Construction work at piperack


Back to the top


PSA unit for hydrogen production

Synthesis-gas-compressor

Tank farm and utility gases



Back to the top

Heat exchanging device on the roof
of steel structure for Fischer Tropsch synthesis plant



July 2007

Das Lager für technische Gase ist errichtet
The liquid oxygen supply tanks are installed.

Isolierung der Prozessausrüstungen in der Gaserzeugung ist abgeschlossen.jpg
Insulation of process equipment in gas production is finished.


Back to the top

Labor
The laboratory start to fill up…


Fitting of the cooling units on the roof of the gas production building



Back to the top


Pipelines: construction work


The Beta Plant



Installation of the cooling units